{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,9]],"date-time":"2024-09-09T06:54:54Z","timestamp":1725864894893},"publisher-location":"Cham","reference-count":22,"publisher":"Springer International Publishing","isbn-type":[{"type":"print","value":"9783319465913"},{"type":"electronic","value":"9783319465920"}],"license":[{"start":{"date-parts":[[2016,9,16]],"date-time":"2016-09-16T00:00:00Z","timestamp":1473984000000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017]]},"DOI":"10.1007\/978-3-319-46592-0_20","type":"book-chapter","created":{"date-parts":[[2016,9,15]],"date-time":"2016-09-15T04:02:44Z","timestamp":1473912164000},"page":"233-242","source":"Crossref","is-referenced-by-count":2,"title":["Searching for a Method of Basic Schedules Generation Which Influences Over the Performance of Predictive and Reactive Schedules"],"prefix":"10.1007","author":[{"given":"Iwona","family":"Paprocka","sequence":"first","affiliation":[]},{"given":"Wojciech M.","family":"Kempa","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,9,16]]},"reference":[{"key":"20_CR1","unstructured":"Paprocka, I., Kempa, W.M., Kalinowski, K., Grabowik, C.: Estimation of overall equipment effectiveness using simulation programme. Mater. Sci. Eng. 95, Article Number: 012155, 1\u20136 (2015)"},{"issue":"1","key":"20_CR2","first-page":"35","volume":"6","author":"EV Guilherme","year":"2003","unstructured":"Guilherme, E.V., Herrmann, J.W., Lin, E.: Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J. Sched. 6(1), 35\u201358 (2003)","journal-title":"J. Sched."},{"issue":"20","key":"20_CR3","doi-asserted-by":"crossref","first-page":"5657","DOI":"10.1080\/00207540802112652","volume":"47","author":"SA Fahmy","year":"2009","unstructured":"Fahmy, S.A., Balakrishnan, S., ElMekkawy, T.Y.: A generic deadlock-free reactive scheduling approach. Int. J. Prod. Res. 47(20), 5657\u20135676 (2009)","journal-title":"Int. J. Prod. Res."},{"key":"20_CR4","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/j.cie.2015.11.005","volume":"91","author":"A Hamzadayi","year":"2016","unstructured":"Hamzadayi, A., Yildiz, G.: Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server. Comput. Ind. Eng. 91, 66\u201384 (2016)","journal-title":"Comput. Ind. Eng."},{"key":"20_CR5","doi-asserted-by":"crossref","first-page":"645","DOI":"10.1007\/s00170-005-0237-0","volume":"31","author":"L Liu","year":"2007","unstructured":"Liu, L., Han-yu, G., Yu-geng, X.: Robust and stable scheduling of a single machine with random machine breakdowns. Int. J. Adv. Manuf. Technol. 31, 645\u2013656 (2007)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"20_CR6","doi-asserted-by":"crossref","first-page":"592","DOI":"10.1016\/j.ejor.2003.12.026","volume":"164","author":"T Kis","year":"2005","unstructured":"Kis, T., Pesch, E.: A review of exact solution methods for the non-preemptive multiprocessor flowshop problem. Eur. J. Oper. Res. 164, 592\u2013608 (2005)","journal-title":"Eur. J. Oper. Res."},{"key":"20_CR7","doi-asserted-by":"crossref","first-page":"116","DOI":"10.1016\/j.ejor.2005.06.067","volume":"177","author":"J Huo","year":"2007","unstructured":"Huo, J., Leung, Y.-T., Zhao, H.: Bi-criterial scheduling problems. Number of tardy jobs and maximum weighted tardiness. Eur. J. Oper. Res. 177, 116\u2013134 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"20_CR8","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0360-8352(99)00136-9","volume":"36","author":"R Cheng","year":"1999","unstructured":"Cheng, R., Gen, M., Tsujimura, Y.: A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: hybrid genetic search strategies. Comput. Ind. Eng. 36, 343\u2013346 (1999)","journal-title":"Comput. Ind. Eng."},{"key":"20_CR9","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1016\/S0377-2217(03)00016-X","volume":"155","author":"DC Mattfeld","year":"2004","unstructured":"Mattfeld, D.C., Bierwirth, Ch.: An efficient genetic algorithm for job shop scheduling with tardiness objectives. Eur. J. Oper. Res. 155, 616\u2013630 (2004)","journal-title":"Eur. J. Oper. Res."},{"key":"20_CR10","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/j.epsr.2005.06.009","volume":"76","author":"G-Ch Liao","year":"2006","unstructured":"Liao, G-Ch.: Short-term thermal generation scheduling using improved immune algorithm. Electr. Power Syst. Res. 76, 360\u2013375 (2006)","journal-title":"Electr. Power Syst. Res."},{"key":"20_CR11","unstructured":"de Castro, L.N., von Zuben, F.J.: Artificial immune systems: Part I\u2014basic theory and applications. Technical Report. TR-DCA 01\/99 (1999)"},{"key":"20_CR12","doi-asserted-by":"crossref","first-page":"406","DOI":"10.1016\/j.amc.2007.04.038","volume":"194","author":"J-T Tsai","year":"2007","unstructured":"Tsai, J.-T., Ho, W.-H.: Improved immune algorithm for global numerical optimization and job-shop scheduling problems. Appl. Math. Comput. 194, 406\u2013424 (2007)","journal-title":"Appl. Math. Comput."},{"key":"20_CR13","doi-asserted-by":"crossref","first-page":"909","DOI":"10.1007\/s00170-003-1731-x","volume":"23","author":"SG Ponnambalam","year":"2004","unstructured":"Ponnambalam, S.G., Jagannathan, H., Kataria, M., Gadicherla, A.: A TSP-GA multi-objective algorithm for flow-shop scheduling. Int. J. Adv. Manuf. Technol. 23, 909\u2013915 (2004)","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"20_CR14","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1016\/S0377-2217(99)00168-X","volume":"124","author":"Ch-F Liaw","year":"2000","unstructured":"Liaw, Ch-F: A hybrid genetic algorithm for the open shop scheduling problem. Eur. J. Oper. Res. 124, 28\u201342 (2000)","journal-title":"Eur. J. Oper. Res."},{"key":"20_CR15","unstructured":"Sko\u0142ud, B., Wosik, I.: The development of IA with local search approach for multi-objective Job shop scheduling problem. In: 3rd International Conference Virtual Design and Automation, Pozna\u0144 (2008)"},{"key":"20_CR16","unstructured":"Sko\u0142ud, B., Wosik, I.: Multi-objective genetic and immune algorithms for batch scheduling problem with dependent setups. In: Recent Developments in Artificial Intelligence Methods, AIMETH. Gliwice, pp. 185\u2013196 (2007)"},{"key":"20_CR17","unstructured":"Wosik, I.: An immune algorithm for scheduling and inspection of heuristics using into an initialization step. In: Information Systems Architecture and Technology. Decision Making Models, pp. 121\u2013128 (2007)"},{"key":"20_CR18","unstructured":"Wosik, I.: A multi-objective immune algorithm and its application to the job shop scheduling. In: 10th International Symposium of Students and Young Mechanical Engineers. Advances in Mechanical Engineering, pp. 211\u2013220. Gda\u0144sk-Gdynia (2007)"},{"key":"20_CR19","unstructured":"Wierzchon, S.T.: Artificial immune systems. In: Theory and Application, Warsaw (2001) (in Polish)"},{"key":"20_CR20","doi-asserted-by":"crossref","first-page":"909","DOI":"10.4028\/www.scientific.net\/AMR.1036.909","volume":"1036","author":"I Paprocka","year":"2014","unstructured":"Paprocka, I., Kempa, W.M., Grabowik, C., Kalinowski, K.: Predictive and reactive scheduling for a critical machine of a production system. Adv. Mater. Res. 1036, 909\u2013914 (2014)","journal-title":"Adv. Mater. Res."},{"key":"20_CR21","doi-asserted-by":"crossref","first-page":"443","DOI":"10.4028\/www.scientific.net\/AMM.307.443","volume":"307","author":"I Paprocka","year":"2013","unstructured":"Paprocka, I., Sko\u0142ud, B.: Robust scheduling, a production scheduling model of failures. Appl. Mech. Mater. 307, 443\u2013446 (2013)","journal-title":"Appl. Mech. Mater."},{"issue":"8","key":"20_CR22","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1080\/09537280110040424","volume":"12","author":"SG Ponnambalam","year":"2001","unstructured":"Ponnambalam, S.G., Ramkumar, V., Jawahar, N.: A multiobjective genetic algorithm for job shop scheduling. Prod. Plann. Control. 12(8), 764\u2013774 (2001)","journal-title":"Prod. Plann. Control."}],"container-title":["Advances in Intelligent Systems and Computing","Information Systems Architecture and Technology: Proceedings of 37th International Conference on Information Systems Architecture and Technology \u2013 ISAT 2016 \u2013 Part IV"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/978-3-319-46592-0_20","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,9,25]],"date-time":"2020-09-25T21:36:36Z","timestamp":1601069796000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/978-3-319-46592-0_20"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,9,16]]},"ISBN":["9783319465913","9783319465920"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/978-3-319-46592-0_20","relation":{},"ISSN":["2194-5357","2194-5365"],"issn-type":[{"type":"print","value":"2194-5357"},{"type":"electronic","value":"2194-5365"}],"subject":[],"published":{"date-parts":[[2016,9,16]]}}}