{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,7]],"date-time":"2024-09-07T08:55:20Z","timestamp":1725699320491},"publisher-location":"London","reference-count":18,"publisher":"Springer London","isbn-type":[{"type":"print","value":"9781447144250"},{"type":"electronic","value":"9781447144267"}],"license":[{"start":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T00:00:00Z","timestamp":1344556800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"},{"start":{"date-parts":[[2012,8,10]],"date-time":"2012-08-10T00:00:00Z","timestamp":1344556800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springernature.com\/gp\/researchers\/text-and-data-mining"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013]]},"DOI":"10.1007\/978-1-4471-4426-7_41","type":"book-chapter","created":{"date-parts":[[2012,8,9]],"date-time":"2012-08-09T15:52:35Z","timestamp":1344527555000},"page":"475-484","update-policy":"http:\/\/dx.doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["Adapting the \u2018Iron Triangle\u2019 to Develop a Framework for Reverse Manufacturing Decision Support Tools"],"prefix":"10.1007","author":[{"given":"P. A.","family":"Goodall","sequence":"first","affiliation":[]},{"given":"E. L.","family":"Rosamond","sequence":"additional","affiliation":[]},{"given":"L. M.","family":"Justham","sequence":"additional","affiliation":[]},{"given":"J. A.","family":"Harding","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,8,10]]},"reference":[{"key":"41_CR1","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1016\/S0263-7863(98)00069-6","volume":"17","author":"R Atkinson","year":"1999","unstructured":"Atkinson R (1999) Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria, Int. J. Project Manage. 17, 337-342.","journal-title":"Int. J. Project Manage"},{"key":"41_CR2","doi-asserted-by":"crossref","unstructured":"Ferrer G, Whybark DC. (2001) Material Planning for a Remanufacturing Facility, Production and Operations Management 10, 112-124.","DOI":"10.1111\/j.1937-5956.2001.tb00073.x"},{"key":"41_CR3","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1287\/mnsc.1060.0600","volume":"53","author":"R Geyer","year":"2007","unstructured":"Geyer R, Van Wassenhove L N, Atasu A (2007) The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles, Management Science 53, 88-100.","journal-title":"Management Science"},{"key":"41_CR4","doi-asserted-by":"crossref","first-page":"467","DOI":"10.1016\/S0272-6963(00)00034-6","volume":"18","author":"V Guide","year":"2000","unstructured":"Guide V D R (2000) Production planning and control for remanufacturing: industry practice and research needs, J. Oper. Manage. 18, 467-483.","journal-title":"J. Oper. Manage."},{"key":"41_CR5","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1287\/opre.1080.0628","volume":"57","author":"V Guide","year":"2009","unstructured":"Guide V D R, Van Wassenhove L N (2009) The Evolution of Closed-Loop Supply Chain Research, Oper. Res. 57, 10-18.","journal-title":"Oper. Res."},{"key":"41_CR6","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1080\/19397030902953080","volume":"2","author":"W L Ijomah","year":"2009","unstructured":"Ijomah W L (2009) Addressing decision making for remanufacturing operations and design-for-remanufacture, - International Journal of Sustainable Engineering. 2, 91-102.","journal-title":"International Journal of Sustainable Engineering"},{"key":"41_CR7","unstructured":"Ijomah W L, Hammond G P, Childe S J, McMahon C A (2005) A Robust Description and Tool for Remanufacturing: A Resource and Energy Recovery Strategy, Environmentally Conscious Design and Inverse Manufacturing, 2005. Eco Design 2005. Fourth International Symposium on, 472-479."},{"key":"41_CR8","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1016\/j.jenvman.2009.09.037","volume":"91","author":"M Ilgin","year":"2010","unstructured":"Ilgin M A, Gupta S M (2010) Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art, J. Environ. Manage. 91, 563-591.","journal-title":"J. Environ. Manage."},{"key":"41_CR9","doi-asserted-by":"crossref","first-page":"4573","DOI":"10.1080\/00207540701440071","volume":"45","author":"H Jun","year":"2007","unstructured":"Jun H, Cusin M, Kiritsis D, Xirouchakis P (2007) A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study, Int J Prod Res 45, 4573-4594.","journal-title":"Int J Prod Res"},{"key":"41_CR10","doi-asserted-by":"crossref","first-page":"249","DOI":"10.1016\/S0263-7863(98)00043-X","volume":"17","author":"D B Khang","year":"1999","unstructured":"Khang D B, Myint Y M (1999). Time, cost and quality trade-off in project management: a case study, Int. J. Project Manage. 17, 249-256.","journal-title":"Int. J. Project Manage"},{"key":"41_CR11","doi-asserted-by":"crossref","first-page":"1147","DOI":"10.1016\/j.jclepro.2006.05.029","volume":"15","author":"M A Seitz","year":"2007","unstructured":"Seitz M A (2007) A critical assessment of motives for product recovery: the case of engine remanufacturing, J. Clean. Prod. 15, 1147-1157.","journal-title":"J. Clean. Prod."},{"key":"41_CR12","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1504\/PIE.2008.018542","volume":"5","author":"T Spengler","year":"2008","unstructured":"Spengler T, Stolting W (2008) Life cycle costing for strategic evaluation of remanufacturing systems, Progress in Industrial Ecology, an International Journal 5, 65-81.","journal-title":"Progress in Industrial Ecology, an International Journal"},{"key":"41_CR13","doi-asserted-by":"crossref","first-page":"378","DOI":"10.1111\/j.1530-9290.2010.00243.x","volume":"14","author":"R Subramanian","year":"2010","unstructured":"Subramanian R, Talbot B, Gupta S (2010) An Approach to Integrating Environmental Considerations within Managerial Decision-Making, Journal of Industrial Ecology 14, 378-398.","journal-title":"Journal of Industrial Ecology"},{"key":"41_CR14","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1017\/S0890060400142040","volume":"14","author":"Y Umeda","year":"2000","unstructured":"Umeda Y, Nonomura A, Tomiyama T, (2000) Study on life-cycle design for the post mass production paradigm, Artificial Intelligence for Engineering Design, Analysis and Manufacturing 14, 149-161.","journal-title":"Artificial Intelligence for Engineering Design, Analysis and Manufacturing"},{"key":"41_CR15","unstructured":"Walsh B (2010) PSS for Product Life Extension through Remanufacturing, CIRP IPS2 Conference, Link\u00f6ping, 261-268."},{"key":"41_CR16","doi-asserted-by":"crossref","first-page":"445","DOI":"10.1016\/S0959-6526(02)00066-5","volume":"11","author":"C D White","year":"2003","unstructured":"White C D, Masanet E, Rosen C M, Beckman S L (2003) Product recovery with some byte: an overview of management challenges and environmental consequences in reverse manufacturing for the computer industry, J. Clean. Prod. 11, 445-458.","journal-title":"J. Clean. Prod."},{"key":"41_CR17","doi-asserted-by":"crossref","first-page":"1702","DOI":"10.1016\/j.wasman.2008.11.009","volume":"29","author":"A Xanthopoulos","year":"2009","unstructured":"Xanthopoulos A, Iakovou E (2009) On the optimal design of the disassembly and recovery processes, Waste Manage. 29, 1702-1711.","journal-title":"Waste Manage"},{"key":"41_CR18","doi-asserted-by":"crossref","first-page":"1206","DOI":"10.1016\/j.ejor.2007.08.004","volume":"191","author":"R Zuidwijk","year":"2008","unstructured":"Zuidwijk R, Krikke H (2008) Strategic response to EEE returns:: Product eco-design or new recovery processes? Eur. J. Oper. Res. 191, 1206-1222.","journal-title":"J. Oper. Res."}],"container-title":["Concurrent Engineering Approaches for Sustainable Product Development in a Multi-Disciplinary Environment"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/978-1-4471-4426-7_41","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,2,19]],"date-time":"2023-02-19T02:00:18Z","timestamp":1676772018000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/978-1-4471-4426-7_41"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,8,10]]},"ISBN":["9781447144250","9781447144267"],"references-count":18,"URL":"https:\/\/doi.org\/10.1007\/978-1-4471-4426-7_41","relation":{},"subject":[],"published":{"date-parts":[[2012,8,10]]},"assertion":[{"value":"10 August 2012","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]}}