{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,4]],"date-time":"2024-09-04T19:01:01Z","timestamp":1725476461045},"publisher-location":"Berlin, Heidelberg","reference-count":22,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540204053"},{"type":"electronic","value":"9783540397274"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2003]]},"DOI":"10.1007\/10968987_11","type":"book-chapter","created":{"date-parts":[[2006,11,16]],"date-time":"2006-11-16T04:23:33Z","timestamp":1163651013000},"page":"208-227","source":"Crossref","is-referenced-by-count":18,"title":["Parallel Job Scheduling under Dynamic Workloads"],"prefix":"10.1007","author":[{"given":"Eitan","family":"Frachtenberg","sequence":"first","affiliation":[]},{"given":"Dror G.","family":"Feitelson","sequence":"additional","affiliation":[]},{"given":"Juan","family":"Fernandez","sequence":"additional","affiliation":[]},{"given":"Fabrizio","family":"Petrini","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"issue":"3","key":"11_CR1","doi-asserted-by":"publisher","first-page":"283","DOI":"10.1145\/380749.380764","volume":"19","author":"A.C. Arpaci-Dusseau","year":"2001","unstructured":"Arpaci-Dusseau, A.C.: Implicit Coscheduling: Coordinated Scheduling with Implicit Information in Distributed Systems. ACM Transactions on Computer Systems\u00a019(3), 283\u2013331 (2001)","journal-title":"ACM Transactions on Computer Systems"},{"key":"11_CR2","doi-asserted-by":"crossref","unstructured":"Batat, A., Feitelson, D.G.: Gang Scheduling with Memory Considerations. In: International Parallel and Distributed Processing Symposium, May 2000, vol.\u00a014, pp. 109\u2013114 (2000)","DOI":"10.1109\/IPDPS.2000.845971"},{"key":"11_CR3","doi-asserted-by":"crossref","unstructured":"Etsion, Y., Tsafrir, D., Feitelson, D.G.: Effects of Clock Resolution on the Scheduling of Interactive and Soft Real-Time Processes. In: SIGMETRICS Conf. Measurement and Modeling of Comput. Syst. (June 2003) (to appear)","DOI":"10.1145\/781027.781049"},{"key":"11_CR4","unstructured":"Feitelson, D.G.: A Survey of Scheduling in Multiprogrammed Parallel Systems. Research Report RC 19790 (87657), IBM T. J. Watson Research Center (October 1994)"},{"key":"11_CR5","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"49","DOI":"10.1007\/3-540-45706-2_4","volume-title":"Euro-Par 2002. Parallel Processing","author":"D.G. Feitelson","year":"2002","unstructured":"Feitelson, D.G.: The Forgotten Factor: Facts; on Performance Evaluation and Its Dependence on Workloads. In: Monien, B., Feldmann, R.L. (eds.) Euro-Par 2002. LNCS, vol.\u00a02400, pp. 49\u201360. Springer, Heidelberg (2002)"},{"issue":"4","key":"11_CR6","doi-asserted-by":"publisher","first-page":"306","DOI":"10.1016\/0743-7315(92)90014-E","volume":"16","author":"D.G. Feitelson","year":"1992","unstructured":"Feitelson, D.G., Rudolph, L.: Gang Scheduling Performance Benefits for Fine-Grain Synchronization. Journal of Parallel and Distributed Computing\u00a016(4), 306\u2013318 (1992)","journal-title":"Journal of Parallel and Distributed Computing"},{"key":"11_CR7","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/BFb0053978","volume-title":"Job Scheduling Strategies for Parallel Processing","author":"D.G. Feitelson","year":"1998","unstructured":"Feitelson, D.G., Rudolph, L.: Metrics and Benchmarking for Parallel Job Scheduling. In: Feitelson, D.G., Rudolph, L. (eds.) IPPS-WS 1998, SPDP-WS 1998, and JSSPP 1998. LNCS, vol.\u00a01459, pp. 1\u201324. Springer, Heidelberg (1998)"},{"key":"11_CR8","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/3-540-63574-2","volume-title":"Job Scheduling Strategies for Parallel Processing","author":"D.G. Feitelson","year":"1997","unstructured":"Feitelson, D.G., Rudolph, L., Schwiegelshohn, U., Sevcik, K.C., Wong, P.: Theory and Practice in Parallel Job Scheduling. In: Feitelson, D.G., Rudolph, L. (eds.) IPPS-WS 1997 and JSSPP 1997. LNCS, vol.\u00a01291, pp. 1\u201334. Springer, Heidelberg (1997)"},{"key":"11_CR9","unstructured":"Frachtenberg, E., Feitelson, D.G., Petrini, F., Fernandez, J.: Flexible CoScheduling: Mitigating load imbalance and improving utilization of heterogeneous resources. In: International Parallel and Distributed Processing Symposium (April 2003, vol.\u00a017 (2003)"},{"key":"11_CR10","doi-asserted-by":"crossref","unstructured":"Frachtenberg, E., Petrini, F., Fernandez, J., Pakin, S., Coll, S.: STORM: Lightning-Fast Resource Management. In: Supercomputing 2002, Baltimore, MD (November 2002)","DOI":"10.1109\/SC.2002.10057"},{"key":"11_CR11","doi-asserted-by":"crossref","unstructured":"Gupta, A., Tucker, A., Urushibara, S.: The Impact of Operating System Scheduling Policies and Synchronization Methods on the Performance of Parallel Applications. In: SIGMETRICS Conf. Measurement and Modeling of Comput. Syst., May 1991, pp. 120\u2013132 (1991)","DOI":"10.1145\/107971.107985"},{"key":"11_CR12","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1007\/3-540-60153-8_35","volume-title":"Job Scheduling Strategies for Parallel Processing","author":"D. Lifka","year":"1995","unstructured":"Lifka, D.: The ANL\/IBM SP Scheduling System. In: Feitelson, D.G., Rudolph, L. (eds.) IPPS-WS 1995 and JSSPP 1995. LNCS, vol.\u00a0949, pp. 295\u2013303. Springer, Heidelberg (1995)"},{"key":"11_CR13","doi-asserted-by":"crossref","unstructured":"Lublin, U., Feitelson, D.G.: The Workload on Parallel Supercomputers: Modeling the Characteristics of Rigid Jobs. Journal of Parallel and Distributed Computing (2003) (to appear)","DOI":"10.1016\/S0743-7315(03)00108-4"},{"key":"11_CR14","doi-asserted-by":"crossref","unstructured":"Moreira, J.E., Chan, W., Fong, L.L., Franke, H., Jette, M.A.: An Infrastructure for Efficient Parallel Job Execution in Terascale Computing Environments. In: Supercomputing 1998 (November 1998)","DOI":"10.1109\/SC.1998.10026"},{"issue":"6","key":"11_CR15","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1109\/71.932708","volume":"12","author":"A.W. Mualem","year":"2001","unstructured":"Mualem, A.W., Feitelson, D.G.: Utilization, Predictability, Workloads, and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling. IEEE Transactions on Parallel and Distributed Systems\u00a012(6), 529\u2013543 (2001)","journal-title":"IEEE Transactions on Parallel and Distributed Systems"},{"key":"11_CR16","unstructured":"Ousterhout, J.K.: Scheduling Techniques for Concurrent Systems. In: 3rd Intl. Conf. Distributed Comput. Syst. (ICDCS), October 1982, pp. 22\u201330 (1982)"},{"issue":"l","key":"11_CR17","doi-asserted-by":"publisher","first-page":"46","DOI":"10.1109\/40.988689","volume":"22","author":"F. Petrini","year":"2002","unstructured":"Petrini, F., Feng, W.c., Hoisie, A., Coll, S., Frachtenberg, E.: The Quadrics Network: High Performance Clustering Technology. IEEE Micro\u00a022(l), 46\u201357 (2002)","journal-title":"IEEE Micro"},{"key":"11_CR18","unstructured":"Quadrics Supercomputers World Ltd. Elan Reference Manual (January 1999)"},{"key":"11_CR19","unstructured":"Quadrics Supercomputers World Ltd. Elan Programming Manual (May 2002)"},{"key":"11_CR20","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"publisher","first-page":"43","DOI":"10.1007\/3-540-47954-6_3","volume-title":"Job Scheduling Strategies for Parallel Processing","author":"D. Talby","year":"1999","unstructured":"Talby, D., Feitelson, D.G., Raveh, A.: Comparing Logs and Models ofParallel Workloads Using the Co-Plot Method. In: Feitelson, D.G., Rudolph, L. (eds.) JSSPP 1999, IPPS-WS 1999, and SPDP-WS 1999. LNCS, vol.\u00a01659, pp. 43\u201366. Springer, Heidelberg (1999)"},{"issue":"8","key":"11_CR21","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1145\/79173.79181","volume":"33","author":"L.G. Valiant","year":"1990","unstructured":"Valiant, L.G.: A Bridging Model for Parallel Computation. Communications of the ACM\u00a033(8), 103\u2013111 (1990)","journal-title":"Communications of the ACM"},{"key":"11_CR22","doi-asserted-by":"crossref","unstructured":"Zhang, Y., Franke, H., Moreira, J.E., Sivasubramaniam, A.: Improving Parallel Job Scheduling by Combining Gang Scheduling and Backfilling Techniques. In: Intl. Parallel & Distributed Processing Symp., May 2000, vol.\u00a014, pp. 133\u2013142 (2000)","DOI":"10.1109\/IPDPS.2000.845975"}],"container-title":["Lecture Notes in Computer Science","Job Scheduling Strategies for Parallel Processing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/10968987_11","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,4,22]],"date-time":"2019-04-22T10:35:11Z","timestamp":1555929311000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/10968987_11"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003]]},"ISBN":["9783540204053","9783540397274"],"references-count":22,"URL":"https:\/\/doi.org\/10.1007\/10968987_11","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2003]]}}}