{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,12]],"date-time":"2024-06-12T06:10:38Z","timestamp":1718172638092},"reference-count":31,"publisher":"Wiley","issue":"5","license":[{"start":{"date-parts":[[2015,11,3]],"date-time":"2015-11-03T00:00:00Z","timestamp":1446508800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/doi.wiley.com\/10.1002\/tdm_license_1.1"},{"start":{"date-parts":[[2015,11,3]],"date-time":"2015-11-03T00:00:00Z","timestamp":1446508800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/onlinelibrary.wiley.com\/termsAndConditions#vor"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Qual. Reliab. Engng. Int."],"published-print":{"date-parts":[[2016,7]]},"DOI":"10.1002\/qre.1916","type":"journal-article","created":{"date-parts":[[2015,11,3]],"date-time":"2015-11-03T05:34:58Z","timestamp":1446528898000},"page":"1825-1835","source":"Crossref","is-referenced-by-count":5,"title":["An Evaluation of the Crosier's CUSUM Control Chart with Estimated Parameters"],"prefix":"10.1002","volume":"32","author":[{"given":"Maureen","family":"Hany","sequence":"first","affiliation":[{"name":"Department of Statistics; Cairo University, Faculty of Economics and Political Science; Cairo Egypt"}]},{"given":"Mahmoud A.","family":"Mahmoud","sequence":"additional","affiliation":[{"name":"Department of Statistics; Cairo University, Faculty of Economics and Political Science; Cairo Egypt"}]}],"member":"311","published-online":{"date-parts":[[2015,11,3]]},"reference":[{"issue":"1-2","key":"10.1002\/qre.1916-BIB0001|qre1916-cit-0001","doi-asserted-by":"crossref","first-page":"100","DOI":"10.1093\/biomet\/41.1-2.100","article-title":"Continuous inspection schemes","volume":"41","author":"Page","year":"1954","journal-title":"Biometrika"},{"issue":"3","key":"10.1002\/qre.1916-BIB0002|qre1916-cit-0002","doi-asserted-by":"crossref","first-page":"187","DOI":"10.1080\/00401706.1986.10488126","article-title":"A new two-sided Cumulative Sum quality control scheme","volume":"28","author":"Crosier","year":"1986","journal-title":"Technometrics"},{"issue":"1","key":"10.1002\/qre.1916-BIB0003|qre1916-cit-0003","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1080\/00401706.1961.10489923","article-title":"Average run lengths in cumulative chart quality control schemes","volume":"3","author":"Goldsmilth","year":"1961","journal-title":"Technometrics"},{"issue":"2","key":"10.1002\/qre.1916-BIB0004|qre1916-cit-0004","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1111\/j.2517-6161.1967.tb00694.x","article-title":"A simple procedure for determining upper and lower limits for the average sample run length of a Cumulative Sum scheme","volume":"29","author":"Kemp","year":"1967","journal-title":"Journal of the Royal Statistical Society: Series B Methodological"},{"issue":"3","key":"10.1002\/qre.1916-BIB0005|qre1916-cit-0005","doi-asserted-by":"crossref","first-page":"539","DOI":"10.1093\/biomet\/59.3.539","article-title":"An approach to the probability distribution of CUSUM run length","volume":"59","author":"Brook","year":"1972","journal-title":"Biometrika"},{"issue":"3","key":"10.1002\/qre.1916-BIB0006|qre1916-cit-0006","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1080\/00401706.1983.10487883","article-title":"The distribution of the run length of one-sided CUSUM procedures for continuous random variables","volume":"25","author":"Woodall","year":"1983","journal-title":"Technometrics"},{"issue":"1","key":"10.1002\/qre.1916-BIB0007|qre1916-cit-0007","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1080\/00401706.1984.10487920","article-title":"On the Markov chain approach to the two-sided CUSUM procedure","volume":"26","author":"Woodall","year":"1984","journal-title":"Technometrics"},{"issue":"1","key":"10.1002\/qre.1916-BIB0008|qre1916-cit-0008","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1080\/00401706.1986.10488098","article-title":"Bounds for the distribution of the run length of one-sided and two-sided CUSUM quality control schemes","volume":"28","author":"Waldmann","year":"1986","journal-title":"Technometrics"},{"key":"10.1002\/qre.1916-BIB0009|qre1916-cit-0009","doi-asserted-by":"crossref","first-page":"251","DOI":"10.2307\/2349058","article-title":"On some non-manufacturing applications of counted data Cumulative Sum (CUSUM) control chart schemes","volume":"38","author":"Osanaiye","year":"1989","journal-title":"The Statistician"},{"key":"10.1002\/qre.1916-BIB0010|qre1916-cit-0010","doi-asserted-by":"crossref","first-page":"783","DOI":"10.1080\/02664760802005878","article-title":"Performance comparison of some likelihood ratio-based statistical surveillance methods","volume":"35","author":"Mahmoud","year":"2008","journal-title":"Journal of Applied Statistics"},{"issue":"4","key":"10.1002\/qre.1916-BIB0011|qre1916-cit-0011","first-page":"411","article-title":"Evaluation of the run-length probability distribution for CUSUM charts: assessing chart performance","volume":"42","author":"Luceno","year":"2000","journal-title":"Technometrics"},{"issue":"2","key":"10.1002\/qre.1916-BIB0012|qre1916-cit-0012","first-page":"91","article-title":"Run length distribution of two-sided CUSUM procedures for continuous random variables","volume":"33","author":"Tan","year":"2005","journal-title":"Bulletin of the Institute of Mathematics Academia Sinica"},{"key":"10.1002\/qre.1916-BIB0013|qre1916-cit-0013","unstructured":"Dunbar MX Analysis and design of one-and two-sided CUSUM charts with known and estimated parameters 2007"},{"issue":"2","key":"10.1002\/qre.1916-BIB0014|qre1916-cit-0014","doi-asserted-by":"crossref","first-page":"650","DOI":"10.1016\/j.ijpe.2011.02.010","article-title":"What are the best sample sizes for the X\u00af and CUSUM charts?","volume":"131","author":"Wu","year":"2011","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"10.1002\/qre.1916-BIB0015|qre1916-cit-0015","first-page":"45","article-title":"Optimal designs of two-sided CUSUM schemes","volume":"24","author":"Fei","year":"2005","journal-title":"Malaysian Journal of Science"},{"issue":"2","key":"10.1002\/qre.1916-BIB0016|qre1916-cit-0016","doi-asserted-by":"crossref","first-page":"176","DOI":"10.1093\/intqhc\/mzr082","article-title":"Assessing the effect of estimation error on risk-adjusted CUSUM chart performance","volume":"24","author":"Jones","year":"2012","journal-title":"International Journal for Quality in Health Care"},{"key":"10.1002\/qre.1916-BIB0017|qre1916-cit-0017","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1002\/qre.1495","article-title":"Exponential CUSUM charts with estimated control limits","volume":"30","author":"Zhang","year":"2014","journal-title":"Quality and Reliability Engineering International"},{"issue":"2","key":"10.1002\/qre.1916-BIB0018|qre1916-cit-0018","doi-asserted-by":"crossref","first-page":"209","DOI":"10.1002\/qre.1304","article-title":"Geometric charts with estimated control limits","volume":"29","author":"Zhang","year":"2013","journal-title":"Quality and Reliability Engineering International"},{"issue":"5","key":"10.1002\/qre.1916-BIB0019|qre1916-cit-0019","doi-asserted-by":"crossref","first-page":"639","DOI":"10.1002\/qre.1413","article-title":"The effect of parameter estimation on upper-sided Bernoulli Cumulative Sum charts","volume":"29","author":"Lee","year":"2013","journal-title":"Quality and Reliability Engineering International"},{"issue":"2","key":"10.1002\/qre.1916-BIB0020|qre1916-cit-0020","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1080\/00224065.2015.11918120","article-title":"The difficulty in designing Shewhart X\u00af and X control charts with estimated parameters","volume":"47","author":"Saleh","year":"2015","journal-title":"Journal of Quality Technology"},{"issue":"4","key":"10.1002\/qre.1916-BIB0021|qre1916-cit-0021","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1080\/00224065.2015.11918140","article-title":"Another look at the EWMA control chart with estimated parameters","volume":"47","author":"Saleh","year":"2015","journal-title":"Journal of Quality Technology"},{"key":"10.1002\/qre.1916-BIB0022|qre1916-cit-0022","doi-asserted-by":"publisher","DOI":"10.1002\/qre.1695","article-title":"A reevaluation of the adaptive exponentially weighted moving average control chart when parameters are estimated","author":"Aly","year":"2014","journal-title":"Quality and Reliability Engineering International"},{"key":"10.1002\/qre.1916-BIB0023|qre1916-cit-0023","doi-asserted-by":"crossref","first-page":"1432","DOI":"10.1080\/03610918.2013.821484","article-title":"A comparison of the performance of phase II simple linear profile control charts when parameters are estimated","volume":"44","author":"Aly","year":"2015","journal-title":"Communications in Statistics-Simulation and Computation"},{"key":"10.1002\/qre.1916-BIB0024|qre1916-cit-0024","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1002\/sjos.12006","article-title":"Guaranteed conditional performance of control charts via bootstrap methods","volume":"40","author":"Gandy","year":"2013","journal-title":"Scandinavian Journal of Statistics"},{"key":"10.1002\/qre.1916-BIB0025|qre1916-cit-0025","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1008112","article-title":"Guaranteed conditional performance of the S2control chart with estimated parameters","author":"Faraz","year":"2015","journal-title":"International Journal of Production Research"},{"key":"10.1002\/qre.1916-BIB0026|qre1916-cit-0026","doi-asserted-by":"crossref","DOI":"10.1002\/qre.1695","article-title":"The performance of the multivariate adaptive exponentially weighted moving average control chart with estimated parameters","author":"Aly","year":"2015","journal-title":"Quality and Reliability Engineering International"},{"key":"10.1002\/qre.1916-BIB0027|qre1916-cit-0027","volume-title":"Introduction to Statistical Quality Control","author":"Montgomery","year":"2009","edition":"6"},{"issue":"1","key":"10.1002\/qre.1916-BIB0028|qre1916-cit-0028","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1080\/00224065.2004.11980254","article-title":"The run length distribution of the CUSUM with estimated parameters","volume":"36","author":"Jones","year":"2004","journal-title":"Journal of Quality Technology"},{"key":"10.1002\/qre.1916-BIB0029|qre1916-cit-0029","doi-asserted-by":"crossref","DOI":"10.1007\/978-1-4612-1686-5","volume-title":"Cumulative Sum Charts and Charting for Quality Improvement","author":"Hawkins","year":"1998"},{"key":"10.1002\/qre.1916-BIB0030|qre1916-cit-0030","unstructured":"Saleh NA Zwetsloot IM Mahmoud MA Woodall WH CUSUM charts with controlled conditional performance under estimated parameters Quality Engineering"},{"issue":"4","key":"10.1002\/qre.1916-BIB0031|qre1916-cit-0031","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1080\/00224065.2010.11917832","article-title":"Estimating the standard deviation in quality-control applications","volume":"42","author":"Mahmoud","year":"2010","journal-title":"Journal of Quality Technology"}],"container-title":["Quality and Reliability Engineering International"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.wiley.com\/onlinelibrary\/tdm\/v1\/articles\/10.1002%2Fqre.1916","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.wiley.com\/onlinelibrary\/tdm\/v1\/articles\/10.1002%2Fqre.1916","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/onlinelibrary.wiley.com\/wol1\/doi\/10.1002\/qre.1916\/fullpdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,12]],"date-time":"2024-06-12T05:35:14Z","timestamp":1718170514000},"score":1,"resource":{"primary":{"URL":"https:\/\/onlinelibrary.wiley.com\/doi\/10.1002\/qre.1916"}},"subtitle":["Evaluation of the C-CUSUM Chart with Estimated Parameters"],"short-title":[],"issued":{"date-parts":[[2015,11,3]]},"references-count":31,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2016,7]]}},"URL":"https:\/\/doi.org\/10.1002\/qre.1916","archive":["Portico"],"relation":{},"ISSN":["0748-8017"],"issn-type":[{"value":"0748-8017","type":"print"}],"subject":[],"published":{"date-parts":[[2015,11,3]]}}}